HOUSTON, Apr 18, 2014 (Canada NewsWire via COMTEX) When completed, will be first fixed wellhead platform installed off the coast of Newfoundland & Labrador, Canada Arup, a multidisciplinary engineering and consulting firm with a reputation for delivering innovative and sustainable designs, announced today that it has been selected by Husky Energy to carry out the detailed engineering design (DED) for the White Rose Extension Project (WREP) concrete gravity structure. Subject to partner, corporate and regulatory approvals, WREP is being developed through the construction of a wellhead platform, and Arup will be responsible for the DED of the concrete gravity structure (CGS) of the wellhead platform. The CGS will be constructed in a purpose-built dry graving dock and, when completed, will be the first fixed wellhead platform off the coast of Newfoundland & Labrador. Arup was engaged by Husky Energy to perform a concept study for the wellhead platform and provided project management and
http://www.publicwire.com/arup-selected-by-husky-energy-to-design-wellhead-platform-concrete-gravity-structure-for-white-rose-extension-project/
No comments:
Post a Comment