Monday, July 10, 2017
Millennial Lithium: Extended Pumping Tests indicate Robust Pasto Grandes Lithium Aquifer
VANCOUVER, BRITISH COLUMBIA MLNLF, (Marketwired Jul 10, 2017) Millennial Lithium Corp. (TSX VENTURE:ML)(FRANKFURT:A3N2)(OTCQB:MLNLF) ( Millennial or the Company ) is pleased to report encouraging results from an extended pumping test of the first production scale well at its Pastos Grandes Project in Salta, Argentina. Pumping well PGPW16-01 was installed in late 2016 to complete extended pumping of the lithium brine to determine the robustness and chemical variation of the aquifer over an extended period. At a pumping rate of 27.7 litres/second (l/s), the
http://bit.ly/2v58dqr
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment