SAN DIEGO, Oct. 17, 2017 (GLOBE NEWSWIRE) Royale Energy, Inc. (OTCQB:ROYL) and Matrix Oil Management Corporation jointly announced the successful completion of the Sansinena 9A-4 well. This is the first well drilled in Sansinena Field since Matrix acquired the field in June 2016. The 9A-4 initially flowed at a rate of 15 barrels per hour which equates to a daily rate of over 350 barrels of oil per day. The well which encountered original pressure of 1500 psi was perforated at approximately 4500
http://bit.ly/2ypiOSA
No comments:
Post a Comment